SWROSWRO desalination plant: Persian Gulf Mine & Metal Industries Special Economic Zone
Bandar Abbas
2,500 m³/day SWRO desalination plant — Persian Gulf Mine & Metal Industries Special Economic Zone

Bandar Abbas (9)
Technical details
Project process
Source water is taken directly from the Persian Gulf, chlorinated and sent to ground filters. After storage, it is pumped to cartridge filters and SWRO units. Permeate is sent to the zone’s water network via a pumping station and transfer pipeline.
Main components
Seawater direct intake, transfer pipeline, ground filter, filtered water storage tank, pump station, filter cartridges, high pressure pumps, pressure vessels and membranes, CIP unit, electrical cells and PLC system.
Associated companies
Design and equipment by Uniha (Austria) with B2A (Austria). All other work carried out by NVCo.